Sections

Weather Forecast

Close

Farmington ISD 192: Ad for Bids: ISC 2019 Mechanical Improvements

Wednesday, July 17, 2019 - 6:08pm

SECTION 00 11 13
ADVERTISEMENT FOR BIDS
ISC 2019 MECHANICAL IMPROVEMENTS AND RENOVATION
510 Walnut Street
Farmington, Minnesota

Independent School District #192 will receive single prime sealed bids for ISC 2019 Mechanical Improvements and Renovation until 2:00 p.m. local time on August 15, 2019 at the Farmington Public Schools District Office, 20655 Flagstaff Avenue, Farmington, Minnesota 55024 at which time and place all bids will be publicly opened and read aloud.
Bidding documents, including the Proposal Form, Drawings and Specifications, will be on file at the Offices of the Architect, Wold Architects and Engineers, 332 Minnesota Street, Suite W2000, Saint Paul, Minnesota 55101. (651) 227-7773; at the Minnesota Builders Exchange; McGraw Hill Construction/Dodge Plan Center; Reed Construction; iSqFt Plan Room (St. Paul, MN); and from PlanWell at https://order.e-arc.com/arcEOC/Secures/PWELL_PrivateList.aspx?PrjType=pub
Albert Lea Builders Exchange; Austin Builders Exchange; Mankato Builders Exchange; Builders Exchange of Rochester
This project includes: Complete mechanical systems replacement, interior renovation and associated civil, structural and electrical work.
American Reprographics Company, 4730 Park Glen Road, St. Louis Park, Minnesota 55416 (952) 697-8800, facsimile (952) 697-8803 will provide complete downloadable sets of the Bidding Documents to prospective bidders and subcontractors. The downloads will be available on or about July 23, 2019. A deposit check in the amount of $25 made out to ARC for each set downloaded via the internet at http://www.e-arc.com/mn/saintlouispark and clicking on the PlanWell icon, then the Public Plan Room icon, select ISC 2019 Mechanical Improvements and Renovation.
Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Independent School District #192 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond.
Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding.
The Owner requires Substantial Completion of the project on or before August 7, 2020.
A pre-bid walkthrough is scheduled for July 31, 2019 from 9 a.m. to 11 a.m. at the Instructional Services Center located at 510 Walnut Street, Farmington, MN. Please meet at door no. 9 at 9a.m.

School Board
INDEPENDENT SCHOOL DISTRICT #192
07/11/19 - 07/18/19


randomness